The Georgia Department of Transportation (GDOT) is proposing a series of improvements to State Route 9 from Upper Hembree Road to Windward Parkway, including the section through Downtown Alpharetta that is commonly referred to as Main Street. The proposed improvements would create a consistent roadway throughout the corridor and would feature four 11-foot travel lanes, a 17-inch raised center median, a 4-foot bicycle lane in each direction, 11.5-ft shoulders with curb and gutters, a 2-foot landscape strip, and 5-foot sidewalks.
Additional information, including an illustration of the proposed roadway cross-section, can be found on the GDOT website (
GO TO SITE).
Past Deadline
The deadline for posting positions was 3:00 PM on March 8, 2010
Subscribe to receive important updates about SR 9/ Main Street Widening.
Feedback
This topic has 374 visitors and 72 positions: 66 on forum positions and 6 off forum positions.
That's 3.6 hours of public comment @ 3 minutes per position.
View Positions