How long have you lived or owned property in Sammamish (if applicable)?
30 years
In consideration of City surface water management functions, please rank the following in order of your personal priorities (from highest to lowest, with 1=not important, 5=very important)?
Stormwater Facilities: Fix damaged facilities and build new infrastructure to accommodate growth. - 4
Environment: Improve water quality and habitat in lakes, streams, and wetlands, for fish and recreational use. - 5
Roadways: Fix/improve drainage issues on major roads in Sammamish. - 2
Neighborhoods: Fix/improve local drainage issues in neighborhoods. - 5
Cost: I would be willing to pay a higher stormwater utility rate to see more stormwater projects implemented quickly.
Agree
Public vs Private Property: Public stormwater funds (collected from citizen’s stormwater utility fee) should be spent on privately-owned property to resolve private drainage issues resulting from growth? (*Note: growth pays for growth, but growth doesn’t pay to resolve existing conditions.)
Agree
Please select the FOUR MOST important criteria for determining which surface water projects get constructed:
Multiple surface water benefits: The project protects or improves natural resources at or near site, such as water quality, fish habitat, stream/lake/wetland characteristics.
Meets other City priorities: The project provides other benefits, such as recreation, education, open space, riparian habitat, community livability, wildlife habitat.
Plan consistency: The project should be ranked highly if it is already identified in an adopted Basin Plan (such as the Zackuse Creek Basin Plan).
Maintains existing stormwater infrastructure: The project improves, corrects a defect, or removes a threat to existing stormwater infrastructure.
Please select the FOUR LEAST important criteria for determining which surface water projects get constructed (list of criteria is same as above):
Safety: The project reduces a safety risk by decreasing/eliminating the safety impact or frequency of the drainage issue.
Multiple surface water benefits: The project protects or improves natural resources at or near site, such as water quality, fish habitat, stream/lake/wetland characteristics.
Meets other City priorities: The project provides other benefits, such as recreation, education, open space, riparian habitat, community livability, wildlife habitat.
Plan consistency: The project should be ranked highly if it is already identified in an adopted Basin Plan (Such as the Zackuse Creek Basin Plan
Virtual Town Hall is not a certified voting system or ballot box. As with any public comment process, participation in Virtual Town Hall is voluntary. The responses in this record are not necessarily representative of the whole population, nor do they reflect the opinions of any government agency or elected officials.
Within Sammamish, I am a: (check all that apply)
How long have you lived or owned property in Sammamish (if applicable)?
30 yearsIn consideration of City surface water management functions, please rank the following in order of your personal priorities (from highest to lowest, with 1=not important, 5=very important)?
Cost: I would be willing to pay a higher stormwater utility rate to see more stormwater projects implemented quickly.
Public vs Private Property: Public stormwater funds (collected from citizen’s stormwater utility fee) should be spent on privately-owned property to resolve private drainage issues resulting from growth? (*Note: growth pays for growth, but growth doesn’t pay to resolve existing conditions.)
Please select the FOUR MOST important criteria for determining which surface water projects get constructed:
Please select the FOUR LEAST important criteria for determining which surface water projects get constructed (list of criteria is same as above):