Please provide feedback on the future Tierra Verde Recreation Center
Background
The Tierra Verde community identified a recreation center as a high priority project when the County was planning use of the Penny for Pinellas funds for the 2010-2019 period. The facility could not be fully funded at that time, but is funded in the current Penny funding cycle (2020-2029). The site location is adjacent to the parking lot at the community park. Due to the location, the structure must be built on piling—it cannot be built at ground level.
Purpose and Scope of the Project
The purpose of the recreation center is to provide onsite management for the Tierra Verde Community Recreation Fields and to provide community space for events and meetings. The facility’s location and funding can meet these needs, but they also limit the size and scope of the project.
Location
The facility is planned for the Tierra Verde Community Park on the south side of the parking lot:
Project Design
An initial design has been prepared for a 4,000-square-foot facility. Pinellas County is seeking community input on this design.
A draft rendering of the multi-purpose room
A draft rendering of the proposed design exterior
Project Webpage for more info: https://pinellas.gov/tvrc/
See also the slides used during the presentation.
Responses
This topic has 241 visitors and 33 responses.
That's 1.7 hours of public comment @ 3 minutes per response.